posted by wap, platform: Android
realiserA16
原来官方说要12月底才能发货,但不懂还会不会延期
贴个官方邮件你看看
Hi,
Realiser A16 Update 14 Nov 2017
Hardware.
We received 25 sets of assembled PCBs as production samples a few weeks ago, and have now completed testing them. Some minor changes were deemed necessary and therefore full production and assembly of the boards is now scheduled to be completed by the end of the first week of December, with delivery about a week later.
We recently received production samples of the metal enclosures, both the HS and 2U versions. Overall we’re pleased with the quality of the finish of both designs. All of the production metal-work has now been completed and is awaiting inspection before being shipped to us. Shipping will take 3-4 weeks.
We’re still waiting on samples to arrive of the plastic enclosures for the headtracker and binaural mics etc. We’re aiming to visit this supplier soon when we travel to China to inspect the metal-work and test some of the assembled production pcbs.
All of the production hardware (with the exception of the plastic parts) should be in the UK before the Christmas break, which will allow us to begin the assembly and testing of all the Realisers.
Firmware
We are continuing to make steady progress on the Realiser firmware – primarily on the user interface. Almost all of the underlying dsp and micro-controller code has been written and tested extensively, and the UI is simply trying to organise this and reduce its complexity. Screenshots and captions of some of the menus are shown below and more information is available on our website.
Whilst it may look somewhat complicated, our goal is that on power-up the Realiser should simply work – using either the user’s own personal PRIR or a factory default.
Once the firmware and UI is complete we can use the sample hardware we currently have for compliance testing and certification. We estimate that compliance testing could begin in mid-December. Other samples will be available for sending to reviewers and selected dealers. When compliance testing is completed successfully we can begin shipment.
Exchange Website
The core functionality of the Realiser Exchange website is nearing completion and will be ready to go live when the Realiser hardware begins shipping.
Once all the production hardware has been received we’ll be in the home straight, since we are in sole control of the firmware and software development. The production samples we have received of the metal-work and assembled pcbs have been excellent and, once the firmware is completed, these samples will allow us to do all necessary compliance testing. One issue is our plastic parts supplier and we’ll be addressing this shortly – however at the moment this isn’t delaying the project.